Incident history

Sep 2026 - Nov 2026

November

Nov 01

6:30 AM - 6:58 AM SAST (28min duration)

Hardware upgrade - www525.jnb1.host-h.net - Planned maintenance - 2880

The scheduled maintenance has been completed.

3 updates
Nov 01

6:00 AM - 8:00 AM SAST (2h duration)

www45.cpt3.host-h.net,www47.cpt1.host-h.net,www47.cpt2.host-h.net & www48.cpt3.host-h.net - Planned maintenance - 2881

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers

October

Oct 31

6:00 AM - 7:30 AM SAST (1h 30min duration)

www49.cpt3.host-h.net, www51.cpt1.host-h.net & www51.cpt3.host-h.net - Planned maintenance - 2879

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Oct 30

9:00 PM - 11:29 PM SAST (2h 30min duration)

Urgent Kernel Reboot Maintenance - Emergency maintenance - 2878

The scheduled maintenance has been completed.

2 updates
Oct 30

6:00 PM - 6:16 PM SAST (17min duration)

sql32.cpt3.host-h.net - Planned maintenance - 2882

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Oct 29

9:00 AM - 9:30 AM SAST (30min duration)

Drive maintenance - www123.jnb2.host-h.net - Emergency maintenance - 2875

The scheduled maintenance has been completed.

2 updates
Oct 28

4:05 PM - 5:53 PM SAST (1h 48min duration)

Unplanned fan maintenance - www41.flk1.host-h.net - Emergency maintenance - 2874

The scheduled maintenance has been completed.

3 updates
Oct 27

10:00 PM - 10:26 PM SAST (27min duration)

File System Maintenance - www110.nur4.host-h.net - Planned maintenance - 2872

The scheduled maintenance has been completed.

2 updates
Oct 27

9:00 PM - 10:15 PM SAST (1h 16min duration)

Managed Server Patches - Planned maintenance - 2871

The scheduled maintenance has been completed.

2 updates
Oct 27

5:00 PM - 7:00 PM SAST (2h duration)

.DE Registry Maintenance - Planned maintenance - 2869

Scheduled from October 27, 05:00 PM SAST until October 27, 07:00 PM SAST

  • Maintenance window: 2 hrs

  • Attending: Registry Engineers

  • Summary: During this scheduled maintenance by the registry, the following services may be unavailable:

Availability Checks
Whois Services
Domain Purchases
Domain Renewals
Domain Updates

  • Symptoms: During this scheduled maintenance by the registry, the following services may be unavailable: Availability Checks Whois Services Domain Purchases Domain Renewals Domain Updates
1 update
Oct 26

9:00 PM - 9:21 PM SAST (22min duration)

Managed server canary patches - Planned maintenance - 2870

The scheduled maintenance has been completed.

2 updates
Oct 23

5:07 PM - 5:07 PM SAST (0min duration)

Card Payments Temporarily Unavailable

Summary:
We are currently experiencing an issue where all credit/debit card payments are unavailable. As a direct result, new domain registrations via the xneelo Control Panel cannot be processed at this time.

EFT (Electronic Funds Transfer) payments remain fully operational and can be used as an alternative payment method while we investigate the issue.

1 update
Impacted:
Payments
Orders
Oct 23

6:30 AM - 7:00 AM SAST (30min duration)

Planned drive maintenance - sql16.jnb2.host-h.net - Planned maintenance - 2858

The scheduled maintenance has been completed.

3 updates
Oct 23

3:40 AM - 3:55 AM SAST (15min duration)

Drive Failure: www26.jnb1.host-h.net - SDB - Emergency maintenance - 2862

The scheduled maintenance has been completed.

3 updates
Oct 22

6:30 PM - 6:42 PM SAST (13min duration)

sql21.cpt1.host-h.net disk swap - Planned maintenance - 2861

The scheduled maintenance has been completed.

2 updates
Oct 22

12:06 PM - 12:06 PM SAST (0min duration)

Invoices currently not available in the xneelo Control Panel.

Invoices within the new xneelo Control Panel are currently not loading. Customers with a konsoleH account can view their invoices in the konsoleH Control Panel as an alternative.

Our engineers are actively investigating and working to resolve the issue

We apologise for any inconvenience caused

1 update
Impacted:
xneelo Control Panel
Oct 22

7:43 AM - 7:43 AM SAST (0min duration)

phpMyAdmin Temporarily unavailable in the xneelo Control Panel

The security patch has been applied successfully, and phpMyAdmin is accessible again via the xneelo Control Panel.

1 update
Impacted:
konsoleH
Oct 22

7:30 AM - 7:57 AM SAST (28min duration)

Drive maintenance - sql16.jnb2.host-h.net - Emergency maintenance - 2857

The scheduled maintenance has been completed.

5 updates
Oct 22

6:00 AM - 6:17 AM SAST (18min duration)

Hardware upgrade - www400.jnb1.host-h.net - Planned maintenance - 2847

The scheduled maintenance has been completed.

3 updates
Oct 21

10:00 PM - 11:00 PM SAST (1h duration)

Cloud Dashboard Access Maintenance - Planned maintenance - 2852

The scheduled maintenance has been completed.

2 updates
Oct 21

4:00 PM - 6:22 PM SAST (2h 22min duration)

Managed server patching - Emergency maintenance - 2849

The scheduled maintenance has been completed.

3 updates
Oct 21

12:23 PM - 6:24 PM SAST (6h 1min duration)

Temporary konsoleH maintenance - Emergency maintenance - 2853

The scheduled maintenance has been completed.

4 updates
Impacted:
konsoleH
Oct 21

11:33 AM - 4:04 PM SAST (4h 31min duration)

2FA SMS temporarily unavailable

The SMS two-factor authentication service is functioning as expected. This incident is now resolved.

3 updates
Impacted:
konsoleH
xneelo Control Panel
Oct 20

9:00 PM - 11:09 PM SAST (2h 9min duration)

Managed server patching - Planned maintenance - 2845

The scheduled maintenance has been completed.

3 updates
Oct 20

12:00 PM - 2:00 PM SAST (2h duration)

.DE Registry Maintenance - Planned maintenance - 2842

The scheduled maintenance has been completed.

3 updates
Oct 19

9:00 PM - 9:07 PM SAST (8min duration)

Canary server patching - Planned maintenance - 2844

The scheduled maintenance has been completed.

3 updates
Oct 19

9:56 AM - Oct 21 10:40 AM SAST (2d 44min duration)

konsoleH File Manager, and SiteBuilder not launching in both control panels

We are pleased to confirm that the Site Builder launcher is accessible again.

Thank you for your patience while we restored this service

5 updates
Impacted:
konsoleH
SiteBuilder
Oct 19

6:30 AM - 6:42 AM SAST (12min duration)

sql20.cpt3.host-h.net - Planned maintenance - 2841

The scheduled maintenance has been completed.

3 updates
Oct 18

6:30 AM - 7:44 AM SAST (1h 15min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2838

The scheduled maintenance has been completed.

3 updates
Oct 18

6:00 AM - 6:17 AM SAST (17min duration)

www46.cpt3.host-h.net - Planned maintenance - 2840

The scheduled maintenance has been completed.

3 updates
Oct 17

6:30 AM - 7:41 AM SAST (1h 12min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2837

The scheduled maintenance has been completed.

3 updates
Oct 17

6:00 AM - 6:13 AM SAST (14min duration)

www1.cpt3.host-h.net - Planned maintenance - 2839

The scheduled maintenance has been completed.

3 updates
Oct 14

10:00 PM - Oct 15 4:00 AM SAST (6h duration)

Maintenance at our Cape Town Data Centre - Planned maintenance - 2813

The scheduled maintenance has been completed.

2 updates
Oct 14

6:00 PM - 6:07 PM SAST (8min duration)

sql18.cpt4.host-h.net - Planned maintenance - 2834

The scheduled maintenance has been completed.

3 updates
Oct 13

9:00 PM - 10:26 PM SAST (1h 26min duration)

Managed server patching - Planned maintenance - 2824

The scheduled maintenance has been completed.

3 updates
Oct 13

9:00 AM - 9:00 AM SAST (0min duration)

SiteBuilder Upgrade - Planned maintenance - 2807

The SiteBuilder upgrade originally scheduled for 13 October 2026 has been postponed at the request of the vendor’s engineering team.

A new network notice will be shared once a revised date has been confirmed.

We apologise for any inconvenience this may cause.

3 updates
Oct 12

9:00 PM - 9:14 PM SAST (15min duration)

Canary server patching - Planned maintenance - 2823

The scheduled maintenance has been completed.

3 updates
Oct 12

6:30 PM - 6:41 PM SAST (12min duration)

Emergency drive Maintenance - www528.jnb1.host-h.net - Emergency maintenance - 2829

The scheduled maintenance has been completed.

3 updates
Oct 12

6:00 PM - 6:08 PM SAST (9min duration)

sql14.cpt3.host-h.net - Planned maintenance - 2825

The scheduled maintenance has been completed.

3 updates
Oct 12

4:15 PM - 4:23 PM SAST (9min duration)

www62.cpt3.host-h.net - Planned maintenance - 2827

The scheduled maintenance has been completed.

4 updates
Oct 12

11:55 AM - Oct 13 5:14 PM SAST (1d 5h 19min duration)

Outgoing Email Sending Delays

We are pleased to confirm that the issue affecting outgoing email delivery has been resolved. Queued emails are now processing successfully, though delivery may still be delayed while the remaining backlog clears. Thank you for your patience.

6 updates
Impacted:
Managed Hosting - Email
Oct 11

6:00 AM - 8:00 AM SAST (2h duration)

www35.cpt4.host-h.net, www36.cpt1.host-h.net, www37.cpt3.host-h.net and www38.cpt1.host-h.net - Planned maintenance - 2819

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Oct 10

11:00 PM - Oct 11 3:00 AM SAST (4h duration)

.COM/.NET SRS Production Environment Extended Planned Outage - Planned maintenance - 2815

The scheduled maintenance has been completed.

2 updates
Oct 10

6:00 AM - 8:00 AM SAST (2h duration)

www34.cpt1.host-h.net, www34.cpt2.host-h.net, www35.cpt2.host-h.net and www35.cpt3.host-h.net - Planned maintenance - 2818

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Oct 09

6:00 AM - 7:00 AM SAST (1h duration)

www33.cpt3.host-h.net - Planned maintenance - 2814

The scheduled maintenance has been completed.

3 updates
Oct 08

10:00 PM - 10:39 PM SAST (40min duration)

File System maintenance - www13.cpt3.host-h.net (197.221.14.13) - Planned maintenance - 2787

The scheduled maintenance has been completed.

5 updates
Oct 08

6:00 AM - 6:45 AM SAST (46min duration)

www32.cpt3.host-h.net - Planned maintenance - 2812

The scheduled maintenance has been completed.

3 updates
Oct 06

9:00 PM - 10:28 PM SAST (1h 28min duration)

Managed server patching - Planned maintenance - 2806

The scheduled maintenance has been completed.

2 updates
Oct 06

3:56 PM - Oct 12 8:19 AM SAST (5d 16h 23min duration)

www59.jnb2.host-h.net - DDoS - affecting web traffic

All websites and email services on the affected server remain stable. Systems are running normally, and this issue is now resolved.

6 updates
Impacted:
Web Hosting
Oct 05

9:00 PM - 9:18 PM SAST (19min duration)

Canary server patching - Planned maintenance - 2805

The scheduled maintenance has been completed.

2 updates
Oct 04

6:00 AM - 7:45 AM SAST (1h 46min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2798

The scheduled maintenance has been completed.

3 updates
Oct 04

5:30 AM - 5:45 AM SAST (15min duration)

sql20.cpt2.host-h.net - Planned maintenance - 2799

The scheduled maintenance has been completed.

3 updates
Oct 03

6:00 AM - 7:40 AM SAST (1h 40min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2797

The scheduled maintenance has been completed.

3 updates
Oct 01

10:00 PM - 10:23 PM SAST (24min duration)

www18.flk1.host-h.net - File System Maintenance - Planned maintenance - 2783

The scheduled maintenance has been completed.

2 updates
Oct 01

9:00 PM - 10:00 PM SAST (1h duration)

Authoritive DNS software upgrade - Planned maintenance - 2792

The scheduled maintenance has been completed.

2 updates
Oct 01

12:30 PM - 2:02 PM SAST (1h 32min duration)

Cloud dashboard access affected - Emergency maintenance - 2796

The scheduled maintenance has been completed.

4 updates
Impacted:
Cloud hosting
Oct 01

9:15 AM - 9:45 AM SAST (30min duration)

www10.cpt1.host-h.net - Emergency maintenance - 2793

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Oct 01

6:00 AM - 6:26 AM SAST (26min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2791

The scheduled maintenance has been completed.

3 updates

September

Sep 30

9:00 PM - 10:38 PM SAST (1h 39min duration)

Managed server patching - Planned maintenance - 2777

The scheduled maintenance has been completed.

3 updates
Sep 30

9:30 AM - Oct 1 10:18 AM SAST (1d 49min duration)

Top Level Domain Registrations Temporarily Unavailable

We are currently experiencing an issue affecting specific domain registrations. At this time, all new domain registrations, transfers and updates are temporarily unavailable.

.co.za, .org.za and .net.za domain extensions are unaffected.

Our external domain provider is actively investigating the root cause and working to restore full domain functionality as quickly as possible.

2 updates
Impacted:
Orders
Domain administration
Sep 30

6:00 AM - 6:38 AM SAST (38min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2785

The scheduled maintenance has been completed.

3 updates
Sep 30

1:00 AM - 1:29 AM SAST (30min duration)

Disk replacement - sql9.flk1.host-h.net - Emergency maintenance - 2789

The scheduled maintenance has been completed.

2 updates
Sep 29

9:00 PM - 11:32 PM SAST (2h 33min duration)

Managed server reboots - Planned maintenance - 2784

The scheduled maintenance has been completed.

5 updates
Sep 29

7:57 PM - 8:53 PM SAST (57min duration)

Intermittent Live Chat issues

We are currently experiencing intermittent issues with our Live Chat platform. Customers might experience delays or issues while trying to contact us on our Live Chat platform as well as not being able to receive responses on Live Chat.

Please get in touch with us at support@xneelo.com if you are unable to successfully connect with us on Live Chat.

2 updates
Impacted:
Customer support
Sep 29

7:00 PM - 7:22 PM SAST (22min duration)

Disk replacement - sql9.flk1.host-h.net - Planned maintenance - 2781

The scheduled maintenance has been completed.

2 updates
Sep 29

11:38 AM - 1:22 PM SAST (1h 45min duration)

Card Payments Temporarily Unavailable

PayFast has implemented a fix on their side. New payments are being processed. We will continue to monitor this until resolution.

2 updates
Impacted:
Payments
Sep 29

6:00 AM - 6:48 AM SAST (48min duration)

www21.cpt4.host-h.net - Planned maintenance - 2779

The scheduled maintenance has been completed.

3 updates
Sep 29

6:00 AM - 6:18 AM SAST (19min duration)

www18.cpt1.host-h.net - Planned maintenance - 2780

The scheduled maintenance has been completed.

3 updates
Sep 28

9:00 PM - 9:38 PM SAST (38min duration)

Canary server patching - Planned maintenance - 2776

The scheduled maintenance has been completed.

2 updates
Sep 26

6:00 AM - 7:44 AM SAST (1h 45min duration)

Multiple Shared Servers - hardware upgrades - Planned maintenance - 2774

The scheduled maintenance has been completed.

2 updates
Sep 23

11:00 AM - 11:12 AM SAST (13min duration)

Replaced failed drive www6.jnb1.host-h.net - Emergency maintenance - 2772

The scheduled maintenance has been completed.

3 updates
Sep 23

7:15 AM - 7:27 AM SAST (12min duration)

Emergency drive swap - www79.jnb2.host-h.net - Emergency maintenance - 2770

The scheduled maintenance has been completed.

2 updates
Sep 23

6:00 AM - 6:17 AM SAST (18min duration)

Multiple Shared Servers - hardware upgrades - Planned maintenance - 2769

Planned maintenance: 2769 - Multiple Shared Servers - hardware upgrades

Scheduled for: September 23, 06:00 AM SAST until September 23, 07:00 AM SAST

  • Maintenance window: 1hr

  • Attending: xneelo Engineers

  • Summary: www15.cpt3.host-h.net + www17.cpt3.host-h.net

  • Symptoms: Websites and email hosted on the affected server will be inaccessible during the maintenance window.

3 updates
Sep 22

9:00 PM - 10:26 PM SAST (1h 27min duration)

Managed Server Patches - Planned maintenance - 2767

The scheduled maintenance has been completed.

2 updates
Sep 22

6:00 AM - 6:47 AM SAST (48min duration)

Multiple Shared Server - hardware upgrades - Planned maintenance - 2764

The scheduled maintenance has been completed.

3 updates
Sep 21

9:00 PM - 9:26 PM SAST (27min duration)

Canary server patching - Planned maintenance - 2766

The scheduled maintenance has been completed.

2 updates
Sep 21

6:30 PM - 6:38 PM SAST (9min duration)

Drive swap www27.jnb2.host-h.net - Emergency maintenance - 2765

The scheduled maintenance has been completed.

3 updates
Sep 20

6:00 AM - 8:00 AM SAST (2h duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2762

The scheduled maintenance has been completed.

3 updates
Sep 20

3:00 AM - 3:45 AM SAST (45min duration)

.COM, .NET SRS Planned Registry Maintenance - Planned maintenance - 2760

The scheduled maintenance has been completed.

2 updates
Sep 19

6:00 AM - 8:00 AM SAST (2h duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2761

The scheduled maintenance has been completed.

3 updates
Sep 19

12:00 AM - 12:17 AM SAST (17min duration)

www8.cpt2.host-h.net - Planned maintenance - 2763

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Sep 18

6:00 AM - 6:38 AM SAST (38min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2759

The scheduled maintenance has been completed.

3 updates
Sep 17

9:00 PM - Sep 18 2:36 AM SAST (5h 36min duration)

sql8.flk1.host-h.net - Database Maintenance - Planned maintenance - 2612

The scheduled maintenance has been completed.

2 updates
Sep 17

6:00 AM - 7:00 AM SAST (1h duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2757

The scheduled maintenance has been completed.

3 updates
Sep 16

6:00 AM - 6:40 AM SAST (40min duration)

Multiple Shared Servers - hardware upgrade - Planned maintenance - 2754

The scheduled maintenance has been completed.

3 updates
Sep 16

5:00 AM - 5:00 AM SAST (0min duration)

sql5.cpt3.host-h.net - Server current down for emergency maintenance - Emergency maintenance - 2756

The scheduled maintenance has been completed.

2 updates
Sep 15

9:00 PM - 11:00 PM SAST (2h duration)

Webmail Servers Debian upgrades: Johannesburg - Planned maintenance - 2755

Scheduled from September 15, 09:00 PM SAST until September 15, 11:00 PM SAST

  • Maintenance window: 2 Hours

  • Attending: xneelo Engineers

  • Summary: Upgrades will be performed on Johannesburg Webmail servers, including a reboot of all webmail servers during the maintenance window.

  • Symptoms: Webmail will be briefly inaccessible during the maintenance window. Desktop and mobile email apps will continue to function as normal.

1 update
Impacted:
Webmail
Sep 15

9:00 PM - 11:03 PM SAST (2h 3min duration)

Managed Server Patches - Planned maintenance - 2749

The scheduled maintenance has been completed.

2 updates
Sep 15

9:00 PM - 11:00 PM SAST (2h duration)

.CO.ZA, .ORG.ZA, .NET.ZA Registry Maintenance - Planned maintenance - 2751

The scheduled maintenance has been completed.

2 updates
Sep 15

6:00 AM - 6:28 AM SAST (28min duration)

www9.cpt1.host-h.net and www13.cpt1.host-h.net - Planned maintenance - 2753

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Sep 14

9:00 PM - 9:09 PM SAST (9min duration)

Managed Server Patches on Canary Servers - Planned maintenance - 2748

The scheduled maintenance has been completed.

3 updates
Sep 14

3:45 PM - Sep 28 3:28 PM SAST (13d 23h 43min duration)

www500.jnb2.host-h.net - DDoS - affecting web traffic

We are pleased to report that website and email services are up and running and the DDoS attack is fully mitigated.

4 updates
Impacted:
Web Hosting
Sep 14

10:29 AM - 10:58 AM SAST (30min duration)

Emergency Hardware Maintenance: sql8.flk1.host-h.net - Emergency maintenance - 2750

The scheduled maintenance has been completed.

3 updates
Sep 12

3:27 PM - Sep 18 11:19 AM SAST (5d 19h 52min duration)

2745 - www522.jnb1.host-h.net DDoS

The impact of the DDoS attack has been resolved by our networking team, and international connectivity to websites on the server has been restored

2 updates
Impacted:
Web Hosting
Sep 11

6:00 AM - 6:35 AM SAST (35min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2743

The scheduled maintenance has been completed.

3 updates
Sep 10

12:34 PM - 6:34 PM SAST (6h duration)

Xneelo Control Panel Intermittent Connectivity

The impact of the DDoS attack has been resolved by our networking team, and connectivity to hosting tools in the xneelo Control Panel and konsoleH is fully restored.

We are continuing to monitor network traffic closely to ensure ongoing stability.

6 updates
Impacted:
xneelo Control Panel
konsoleH
Sep 10

6:00 AM - 6:50 AM SAST (50min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2740

The scheduled maintenance has been completed.

3 updates
Sep 09

10:00 PM - 10:30 PM SAST (30min duration)

Managed Shared Server Reboots - Planned maintenance - 2741

The scheduled maintenance has been completed.

5 updates
Sep 09

6:00 AM - 6:28 AM SAST (28min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2734

The scheduled maintenance has been completed.

3 updates
Sep 09

2:08 AM - 2:08 AM SAST (0min duration)

Chat service is currently unavailable

Attending: Product team
Summary: The Fresh/Live Chat service is currently unavailable, and our team is currently investigating the issue.
Symptoms: Fresh/Live Chat will be inaccessible.

1 update
Impacted:
Customer support
Sep 08

9:00 PM - 11:20 PM SAST (2h 21min duration)

Managed server patching - Planned maintenance - 2732

The scheduled maintenance has been completed.

3 updates
Sep 08

6:00 PM - 6:32 PM SAST (32min duration)

sql34.cpt3.host-h.net and sql13.cpt1.host-h.net - Planned maintenance - 2736

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Sep 08

5:15 PM - 5:38 PM SAST (24min duration)

www5.cpt2.host-h.net - Emergency maintenance - 2738

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Sep 08

6:00 AM - 6:39 AM SAST (39min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2730

The scheduled maintenance has been completed.

3 updates
Sep 07

9:00 PM - 9:15 PM SAST (16min duration)

Canary server patching - Planned maintenance - 2731

The scheduled maintenance has been completed.

3 updates
Sep 07

8:00 PM - 11:25 PM SAST (3h 25min duration)

Multiple Shared Servers - Filesystem Maintenance - Emergency maintenance - 2733

The scheduled maintenance has been completed.

3 updates
Sep 07

6:00 PM - 6:16 PM SAST (16min duration)

sql12.cpt2.host-h.net and sql34.cpt3.host-h.net - Planned maintenance - 2729

The scheduled maintenance has been completed.

4 updates
Impacted:
Managed Servers
Sep 07

6:30 AM - 6:39 AM SAST (10min duration)

sql19.cpt1.host-h.net disk replacement - Planned maintenance - 2727

The scheduled maintenance has been completed.

2 updates
Sep 05

6:00 AM - 7:48 AM SAST (1h 48min duration)

Multiple Cape Town shared server hardware upgrades - Planned maintenance - 2723

The scheduled maintenance has been completed.

2 updates
Sep 05

5:00 AM - 5:59 AM SAST (1h duration)

Fan Maintenance -Multiple SQL and Shared hosts - Planned maintenance - 2718

The scheduled maintenance has been completed.

3 updates
Sep 04

7:42 PM - Sep 5 12:00 AM SAST (4h 17min duration)

Server Maintenance: www68.jnb2.host-h.net, www521.jnb1.host-h.net - Planned maintenance - 2725

The scheduled maintenance has been completed.

3 updates
Sep 04

3:30 PM - Sep 5 1:30 AM SAST (10h duration)

Server Maintenance: www502.jnb2.host-h.net - Emergency maintenance - 2724

The scheduled maintenance has been completed.

3 updates
Sep 04

6:30 AM - 6:44 AM SAST (15min duration)

www52.cpt3.host-h.net - Planned maintenance - 2721

The scheduled maintenance has been completed.

3 updates
Sep 04

6:20 AM - 6:20 AM SAST (0min duration)

Emergency Maintenance - www24.cpt3.host-h.net - Emergency maintenance - 2722

The scheduled maintenance has been completed.

3 updates
Sep 04

6:00 AM - 6:26 AM SAST (26min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2719

The scheduled maintenance has been completed.

3 updates
Sep 03

6:00 AM - 6:41 AM SAST (42min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2717

The scheduled maintenance has been completed.

3 updates
Sep 02

11:31 AM - 11:31 AM SAST (0min duration)

xneelo Control Panel Intermittent Connectivity

We are aware of intermittent connectivity issues affecting hosting tools in the xneelo Control Panel.

Our Engineers are investigating the issue.

1 update
Impacted:
xneelo Control Panel
Sep 02

6:00 AM - 6:23 AM SAST (23min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2712

The scheduled maintenance has been completed.

3 updates
Sep 01

9:00 PM - 11:00 PM SAST (2h duration)

Webmail Servers Debian upgrades: Johannesburg - Planned maintenance - 2709

Scheduled from September 1, 09:00 PM SAST until September 1, 11:00 PM SAST

  • Maintenance window: 2 Hours

  • Attending: xneelo Engineers

  • Summary: We are upgrading the operating system on our Cape Town Webmail servers to Debian 13 (Trixie). The upgrades will be performed between 21:00 and 23:00.
    We apologise for any inconvenience caused and appreciate your patience.

  • Symptoms: Webmail will be offline during maintenance. Standard email desktop and mobile apps will continue to work as normal.

1 update
Sep 01

10:11 AM - Sep 2 2:43 PM SAST (1d 4h 32min duration)

Slow webmail response times for domain hosted in Johannesburg

Our engineers have made changes to the server to address the degraded performance and the webmail service is accessible again.

6 updates
Impacted:
Webmail
Sep 01

8:47 AM - Sep 10 3:30 PM SAST (9d 6h 43min duration)

Intermittent email connectivity on Shared Servers in Johannesburg

This incident is now resolved following continued monitoring. Email service is confirmed to be functioning normally. Customers affected by this incident can expect a detailed incident report tomorrow, Friday, 11 September.

26 updates
Impacted:
Managed Hosting - Email
Sep 01

6:00 AM - 6:34 AM SAST (34min duration)

Multiple Shared Server - Hardware Upgrades - Planned maintenance - 2707

The scheduled maintenance has been completed.

3 updates