12:00 PM - 12:21 PM SAST (21min duration)
Emergency maintenance: 1173 - www418.jnb1.host-h.net Ram and Fan replacement
The scheduled maintenance has been completed.
10:30 AM - 10:41 AM SAST (12min duration)
Emergency maintenance: 1169 - www77.cpt1.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:22 AM SAST (22min duration)
Planned maintenance: 1167 - sql1.jnb3.host-h.net Drive Upgrade
The scheduled maintenance has been completed.
6:40 AM - 7:06 AM SAST (26min duration)
Emergency maintenance: 1166 - Drive replacement: sql1.jnb3.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:30 AM SAST (30min duration)
Planned maintenance: 1162 - Drive replacement: www84.jnb2.host-h.net
The scheduled maintenance has been completed.
10:00 PM - Feb 26 12:00 AM SAST (2h duration)
Planned maintenance: 1155 - Cape Town Data Centre - Automatic Transfer Switch Maintenance
The scheduled maintenance has been completed.
9:00 PM - 11:58 PM SAST (2h 58min duration)
Planned maintenance: 1159 - Software updates
The scheduled maintenance has been completed.
6:00 PM - 9:30 PM SAST (3h 30min duration)
Planned maintenance: 1154 - .ME Registry Maintenance
The scheduled maintenance has been completed.
2:08 PM - Feb 26 6:55 AM SAST (16h 48min duration)
Planned maintenance: 1164 - www19.cpt4.host-h.net and www43.cpt3.host-h.net hardware upgrades
The scheduled maintenance has been completed.
9:52 AM - 10:13 AM SAST (21min duration)
Emergency maintenance: 1160 - www42.cpt3.host-h.net disk replacement
The scheduled maintenance has been completed.
6:30 AM - 6:41 AM SAST (11min duration)
Planned maintenance: 1157 - www2.cpt1.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:09 AM SAST (9min duration)
Planned maintenance: 1156 - www42.cpt3.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:50 AM SAST (20min duration)
Emergency maintenance: 1153 - Drive maintenance - www7.jnb1.host-h.net (196.22.132.7)
The scheduled maintenance has been completed.
6:30 AM - 6:48 AM SAST (18min duration)
Planned maintenance: 1147 - Hardware upgrade 2nd phase - www10.jnb1.host-h.net (196.22.132.10)
The scheduled maintenance has been completed.
5:00 AM - 7:09 AM SAST (2h 10min duration)
The scheduled maintenance has been completed.
4:30 AM - 4:58 AM SAST (29min duration)
Planned maintenance: 1146 - Hardware upgrade 1st phase - www10.jnb1.host-h.net (196.22.132.10)
The scheduled maintenance has been completed.
7:21 PM - Feb 28 7:21 PM SAST (7d duration)
Planned maintenance: 1151 - Cape Town Data Centre Uplink Migration
The scheduled maintenance has been completed.
11:55 AM - Feb 21 1:42 PM SAST (1d 1h 48min duration)
Cape Town services unavailable
We are currently experiencing network issues in our Cape Town data centre, impacting Webmail, email and website/database services for hosted domains. This may result in intermittent service disruptions. Our engineers are actively investigating the issue.
6:23 AM - 6:41 AM SAST (18min duration)
Planned maintenance: 1138 - sql28.cpt1.host-h.net
The scheduled maintenance has been completed.
9:00 PM - Feb 20 8:00 AM SAST (11h duration)
Planned maintenance: 1135 - Cape Town Data Centre Uplink Migration
Following connection issues during the maintenance window, the migration has been put on hold and will be rescheduled.
We will inform customers as soon as the new migration date has been confirmed.
Please accept our sincere apologies for the inconvenience caused during this time.
7:00 AM - 10:00 AM SAST (3h duration)
Planned maintenance: 1130 - .EU Registry Maintenance
The scheduled maintenance has been completed.
9:05 PM - 9:05 PM SAST (0min duration)
We are currently experiencing an outage in our Cape Town Data Centre which is affecting hosting and infrastructure servers.
Customers may experience errors connecting to Webmail, mail delivery delays, and some websites being inaccessible.
Our technicians are investigating.
6:00 PM - 8:00 PM SAST (2h duration)
Planned maintenance: 1124 - .APP Registry Maintenance
The scheduled maintenance has been completed.
6:00 AM - 6:26 AM SAST (27min duration)
Planned maintenance: 1126 - Drive maintenance - sql13.jnb2.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
Emergency maintenance: 1125 - Drive maintenance - sql13.jnb2.host-h.net
The scheduled maintenance has been completed.
6:13 AM - 7:13 AM SAST (1h duration)
Planned maintenance: 1128 - www18.cpt4.host-h.net and www55.cpt3.host-h.net
The scheduled maintenance has been completed.
1:27 PM - 2:30 PM SAST (1h 3min duration)
Delays with .co.za domain registration and renewals
Customers might receive a notice regarding their domain renewals not being successful and that the domain is currently in "PendingDelete".
Customers can safely ignore this email and rest assured that their domains will be renewed successfully.
8:00 PM - Feb 16 12:00 AM SAST (4h duration)
Planned maintenance: 1123 - Card Payment Portal Maintenance (Payfast)
The scheduled maintenance has been completed.
12:30 AM - 6:00 AM SAST (5h 30min duration)
Planned maintenance: 1114 - Cape Town Data Centre move - 14 February 2025 (batch 3)
The relocation of the servers affected during this session has been successfully completed and is back online.
11:15 PM - Feb 15 4:01 AM SAST (4h 47min duration)
Planned maintenance: 1113 - Cape Town Data Centre move - 14 February 2025 (batch 2)
The relocation of the servers affected during this session has been successfully completed and is back online.
10:00 PM - Feb 15 2:09 AM SAST (4h 9min duration)
Planned maintenance: 1112 - Cape Town Data Centre move - 14 February 2025 (batch 1)
The relocation of the servers affected during this session has been successfully completed and is back online.
6:30 AM - 7:00 AM SAST (30min duration)
Planned maintenance: 1121 - www71.cpt1.host-h.net
The scheduled maintenance has been completed.
9:00 PM - 10:45 PM SAST (1h 46min duration)
Planned maintenance: 1120 - Security Patch
The scheduled maintenance has been completed.
9:00 PM - Feb 14 12:30 AM SAST (3h 30min duration)
Planned maintenance: 1111 - Self-Managed network routing migration on 13 February 2025
The scheduled maintenance has been completed.
6:00 PM - 8:00 PM SAST (2h duration)
Planned maintenance: 1109 - Cape Town Preventative Fibre Maintenance
The scheduled maintenance has been completed.
4:17 PM - Feb 19 12:41 PM SAST (5d 20h 24min duration)
Trouble viewing outbound mail logs
The Mail log tool is functional again
12:30 AM - 4:16 AM SAST (3h 47min duration)
Planned maintenance: 1106 - Cape Town Data Centre move - 13 February 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Feb 13 2:38 AM SAST (3h 23min duration)
Planned maintenance: 1105 - Cape Town Data Centre move - 12 February 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Feb 13 1:28 AM SAST (3h 28min duration)
Planned maintenance: 1104 - Cape Town Data Centre move - 12 February 2025 (batch 1)
The scheduled maintenance has been completed.
12:23 PM - 12:41 PM SAST (18min duration)
Emergency maintenance: 1117 - File System Maintenance - www131.jnb2.host-h.net
The scheduled maintenance has been completed.
10:00 PM - 10:49 PM SAST (49min duration)
Planned maintenance: 1103 - File System Maintenance - www131.jnb2.host-h.net
The scheduled maintenance has been completed.
6:00 PM - Feb 13 11:12 PM SAST (2d 5h 12min duration)
Planned maintenance: 1110 - Cape Town Preventative Fibre Maintenance
The scheduled maintenance has been completed.
11:00 AM - 12:58 PM SAST (1h 58min duration)
Planned maintenance: 1108 - Cape Town Data Centre move: Infrastructure servers
The scheduled maintenance has been completed.
10:30 AM - 10:47 AM SAST (18min duration)
Emergency maintenance: 1107 - www71.cpt1.host-h.net hardware replacement
The scheduled maintenance has been completed.
12:30 AM - 3:15 AM SAST (2h 46min duration)
Planned maintenance: 1096 - Cape Town Data Centre move - 10 February 2025 (batch 3)
Our Data Centre Engineers have completed the relocation of servers affected during this session and servers are now back online. Affected email and websites will now be reachable again.
12:30 AM - 3:00 AM SAST (2h 30min duration)
Planned maintenance: 1102 - Email Support and Webmail access
The scheduled maintenance has been completed.
11:15 PM - Feb 10 1:33 AM SAST (2h 18min duration)
Planned maintenance: 1095 - Cape Town Data Centre move - 9 February 2025 (batch 2)
Our Data Centre Engineers have completed the relocation of servers affected during this session and servers are now back online. Affected email and websites will now be reachable again.
10:00 PM - 10:00 PM SAST (0min duration)
Planned maintenance: 1099 - www59.cpt1.host-h.net hardware upgrade 2nd phase
The scheduled maintenance has been completed.
10:00 PM - Feb 10 12:45 AM SAST (2h 46min duration)
Planned maintenance: 1094 - Cape Town Data Centre move - 9 February 2025 (batch 1)
Our Data Centre Engineers have completed the relocation of servers affected during this session and servers are now back online. Affected email and websites will now be reachable again.
6:00 AM - 7:00 AM SAST (1h duration)
Planned maintenance: 1100 - Hardware Upgrade: Multiple shared servers
The scheduled maintenance has been completed.
3:00 AM - 3:45 AM SAST (45min duration)
Planned maintenance: 1092 - .COM, .NET Registry Maintenance
The scheduled maintenance has been completed.
12:30 AM - 3:16 AM SAST (2h 46min duration)
Planned maintenance: 1091 - Cape Town Data Centre move - 8 February 2025 (batch 3)
Our Data Centre Engineers have completed the relocation of servers affected during this session and servers are now back online. Affected email and websites will now be reachable again.
11:15 PM - Feb 8 2:05 AM SAST (2h 51min duration)
Planned maintenance: 1090 - Cape Town Data Centre move - 7 February 2025 (batch 2)
Our Data Centre Engineers have completed the relocation of servers affected during this session and servers are now back online. Affected email and websites will now be reachable again.
10:00 PM - 10:00 PM SAST (0min duration)
Planned maintenance: 1098 - www59.cpt1.host-h.net hardware upgrade 1st phase
The scheduled maintenance has been completed.
10:00 PM - Feb 8 1:05 AM SAST (3h 6min duration)
Planned maintenance: 1089 - Cape Town Data Centre move - 7 February 2025 (batch 1)
Our Data Centre Engineers have completed the relocation of servers affected during this session and servers are now back online. Affected email and websites will now be reachable again.
4:00 PM - 4:30 PM SAST (30min duration)
Emergency maintenance: 1101 - www59.cpt1.host-h.net
The scheduled maintenance has been completed.
12:00 PM - 12:30 PM SAST (30min duration)
Emergency maintenance: 1097 - www59.cpt1.host-h.net
The scheduled maintenance has been completed.
6:30 AM - Feb 7 6:42 AM SAST (1d 13min duration)
Planned maintenance: 1093 - Multiple Shared Servers
The scheduled maintenance has been completed.
12:30 AM - 4:01 AM SAST (3h 31min duration)
Planned maintenance: 1085 - Cape Town Data Centre move - 6 February 2025 (batch3)
The scheduled maintenance has been completed.
11:15 PM - Feb 6 3:05 AM SAST (3h 51min duration)
Planned maintenance: 1084 - Cape Town Data Centre move - 5 February 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Feb 6 12:52 AM SAST (2h 53min duration)
Planned maintenance: 1083 - Cape Town Data Centre move - 5 February 2025 (batch 1)
The scheduled maintenance has been completed.
6:00 AM - 6:43 AM SAST (43min duration)
Planned maintenance: 1088 - Multiple Shared Servers - full hardware upgrade
The scheduled maintenance has been completed.
8:00 PM - 9:52 PM SAST (1h 52min duration)
Planned maintenance: 1071 - Kernel Reboot Maintenance
The scheduled maintenance has been completed.
5:00 PM - 6:00 PM SAST (1h duration)
Planned maintenance: 1082 - .DE Registry Maintenance
The scheduled maintenance has been completed.
6:00 AM - 6:25 AM SAST (26min duration)
Planned maintenance: 1081 - Drive replacement: www423.jnb1.host-h.net
The scheduled maintenance has been completed.
8:00 PM - 8:22 PM SAST (23min duration)
Planned maintenance: 1086 - Drive maintenance - www23.flk1.host-h.net
The scheduled maintenance has been completed.
1:11 AM - 1:36 AM SAST (26min duration)
Multiple Cape Town Server down
Multiple Cape Town servers were inaccessible, but our engineers rectified the error.
12:30 AM - 3:50 AM SAST (3h 21min duration)
Planned maintenance: 1075 - Cape Town Data Centre move - 1 February 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Feb 1 1:57 AM SAST (2h 42min duration)
Planned maintenance: 1074 - Cape Town Data Centre move - 31 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - 11:57 PM SAST (1h 57min duration)
Planned maintenance: 1073 - Cape Town Data Centre move - 31 January 2025 (batch 1)
The scheduled maintenance has been completed.
3:30 PM - 4:00 PM SAST (30min duration)
Emergency maintenance: 1079 - www17.cpt3.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:16 AM SAST (17min duration)
Planned maintenance: 1070 - Second phase drive upgrade - sql21.jnb1.host-h.net ( 129.232.136.103 )
The scheduled maintenance has been completed.
6:00 AM - 6:30 AM SAST (30min duration)
Planned maintenance: 1078 - sql3.cpt3.host-h.net
The scheduled maintenance has been completed.
10:00 AM - 2:47 PM SAST (4h 48min duration)
Planned maintenance: 1076 - Upgrade Managed Hosting backup and restore infrastructure in Cape Town
The scheduled maintenance has been completed.
6:00 AM - 6:20 AM SAST (21min duration)
The scheduled maintenance has been completed.
12:30 AM - 5:18 AM SAST (4h 49min duration)
Planned maintenance: 1063 - Cape Town Data Centre move - 30 January 2025 (batch 3)
The relocation of the servers affected during this session has been successfully completed and is back online.
12:00 AM - Jan 31 4:00 AM SAST (1d 4h duration)
Planned maintenance: 1068 - .COM, .NET, .CC Registry Maintenance
The scheduled maintenance has been completed.
11:15 PM - Jan 30 2:29 AM SAST (3h 15min duration)
Planned maintenance: 1062 - Cape Town Data Centre move - 29 January 2025 (batch 2)
The relocation of the servers affected during this session has been successfully completed and is back online.
10:00 PM - Jan 30 1:03 AM SAST (3h 3min duration)
Planned maintenance: 1061 - Cape Town Data Centre move - 29 January 2025 (batch 1)
The relocation of the servers affected during this session has been successfully completed and is back online.
6:00 AM - 6:22 AM SAST (23min duration)
Planned maintenance: 1067 - Hardware upgrade - www538.jnb1.host-h.net
The scheduled maintenance has been completed.
5:00 PM - 6:30 PM SAST (1h 30min duration)
Planned maintenance: 1060 - Planned maintenance: .DE Registry Maintenance
The scheduled maintenance has been completed.
11:00 AM - 2:00 PM SAST (3h duration)
Planned maintenance: 1065 - Upgrade Backup Infrastructure - Managed Hosting in JNB
The scheduled maintenance has been completed.
9:00 AM - 2:00 PM SAST (5h duration)
Planned maintenance: 1055 - Backup server move - 28 January 2025
The scheduled maintenance has been completed.
6:00 AM - 6:28 AM SAST (28min duration)
Planned maintenance: 1059 - Drive maintenance - sql50.jnb2.host-h.net
The scheduled maintenance has been completed.
9:30 AM - 9:48 AM SAST (18min duration)
Emergency maintenance: 1064 - www57.cpt1.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:53 AM SAST (24min duration)
Emergency maintenance: 1058 - Drive maintenance - sql50.jnb2.host-h.net
The scheduled maintenance has been completed.
11:15 PM - Jan 27 2:06 AM SAST (2h 51min duration)
Planned maintenance: 1053 - Cape Town Data Centre move - 26 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Jan 27 12:35 AM SAST (2h 35min duration)
Planned maintenance: 1052 - Cape Town Data Centre move - 26 January 2025 (batch 1)
The scheduled maintenance has been completed.
9:00 PM - Jan 27 2:07 AM SAST (5h 7min duration)
Planned maintenance: 1054 - Backup server move - 26 January 2025
The scheduled maintenance has been completed.
8:30 AM - 9:24 AM SAST (54min duration)
Emergency maintenance: 1057 - www33.cpt1.host-h.net down
The scheduled maintenance has been completed.
6:30 AM - 6:58 AM SAST (29min duration)
Planned maintenance: 1056 - Multiple Shared Servers
The scheduled maintenance has been completed.
6:30 AM - 6:41 AM SAST (12min duration)
The scheduled maintenance has been completed.
6:00 AM - 6:12 AM SAST (12min duration)
Planned maintenance: 1051 - Drive upgrade - www77.jnb2.host-h.net
The scheduled maintenance has been completed.
12:30 AM - 2:20 AM SAST (1h 50min duration)
Planned maintenance: 1041 - Cape Town Data Centre move - 25 January 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Jan 25 1:13 AM SAST (1h 59min duration)
Planned maintenance: 1040 - Cape Town Data Centre move - 24 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Jan 25 12:23 AM SAST (2h 23min duration)
Planned maintenance: 1039 - Cape Town Data Centre move - 24 January 2025 (batch 1)
The scheduled maintenance has been completed.
6:30 AM - 6:53 AM SAST (24min duration)
Planned maintenance: 1050 - Drive upgrade - www77.jnb2.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:40 AM SAST (11min duration)
The scheduled maintenance has been completed.
6:30 AM - 6:30 AM SAST (0min duration)
Planned maintenance: 1045 - First drive replacement - sql3.jnb3.host-h.net (156.38.230.141)
The scheduled maintenance has been completed.
6:00 AM - 6:23 AM SAST (24min duration)
Emergency maintenance: 1049 - Drive upgrade - www500.jnb2.host-h.net
The scheduled maintenance has been completed.
8:00 PM - 11:34 PM SAST (3h 34min duration)
Planned maintenance: 1037 - Disk Maintenance www34.cpt1.host-h.net
The scheduled maintenance has been completed.
6:00 PM - 6:28 PM SAST (29min duration)
Emergency maintenance: 1048 - Drive upgrade - www500.jnb2.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:50 AM SAST (21min duration)
Planned maintenance: 1038 - Hardware upgrade - www540.jnb1.host-h.net
The scheduled maintenance has been completed.
12:30 AM - 4:37 AM SAST (4h 8min duration)
Planned maintenance: 1035 - Cape Town Data Centre move - 23 January 2025 (batch 3)
The relocation of the servers affected during this session has been successfully completed and is back online.
11:15 PM - Jan 23 2:21 AM SAST (3h 7min duration)
Planned maintenance: 1033 - Cape Town Data Centre move - 22 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Jan 23 1:47 AM SAST (3h 47min duration)
Planned maintenance: 1032 - Cape Town Data Centre move - 22 January 2005 (batch 1)
The scheduled maintenance has been completed.
9:00 PM - 11:00 PM SAST (2h duration)
Planned maintenance: 1031 - Cloud Platform system updates
The scheduled maintenance has been completed.
6:00 PM - 6:00 PM SAST (0min duration)
Planned maintenance: 1036 - Hardware Upgrade : Multiple shared servers
The scheduled maintenance has been completed.
1:08 PM - 5:26 PM SAST (4h 17min duration)
Restores are available again within konsoleH and the xneelo Control Panel.
11:23 AM - 1:14 PM SAST (1h 50min duration)
Intermittent Office Network Connectivity
Our team have resolved the issue and connectivity has been restored.
11:00 AM - 12:17 PM SAST (1h 17min duration)
Planned maintenance: 1034 - Upgrade Backup Infrastructure - Managed Hosting in DE
The scheduled maintenance has been completed.
6:30 AM - 6:44 AM SAST (15min duration)
Emergency maintenance: 1030 - Drive maintenance - www26.jnb1.host-h.net and www22.jnb1.host-h.net
The scheduled maintenance has been completed.
12:30 AM - 1:54 AM SAST (1h 25min duration)
Planned maintenance: 1028 - Cape Town Data Centre move - 19 January 2025 (batch 4)
Update 3: The relocation of the servers affected during this session has been successfully completed and is back online.
11:15 PM - Jan 20 1:54 AM SAST (2h 40min duration)
Planned maintenance: 1027 - Cape Town Data Centre move - 19 January 2025 (batch 3)
Update 3: The relocation of the servers affected during this session has been successfully completed and is back online.
10:00 PM - Jan 20 12:34 AM SAST (2h 34min duration)
Planned maintenance: 1026 - Cape Town Data Centre move - 19 January 2025 (batch 2)
Update 3: The relocation of the servers affected during this session has been successfully completed and is back online.
8:30 PM - 11:11 PM SAST (2h 42min duration)
Planned maintenance: 1025 - Cape Town Data Centre move - 19 January 2025 (batch 1)
Update: The relocation of the servers affected during this session has been successfully completed and is back online.
6:15 AM - 6:42 AM SAST (27min duration)
Planned maintenance: 1029 - Multiple Sql Servers
The scheduled maintenance has been completed.
12:30 AM - 4:56 AM SAST (4h 26min duration)
Planned maintenance: 1023 - Cape Town Data Centre move - 17 January 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Jan 18 3:48 AM SAST (4h 34min duration)
Planned maintenance: 1022 - Cape Town Data Centre move - 17 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Jan 18 12:29 AM SAST (2h 29min duration)
Planned maintenance: 1021 - Cape Town Data Centre move - 17 January 2025 (batch 1)
The scheduled maintenance has been completed.
6:30 AM - 6:40 AM SAST (11min duration)
Planned maintenance: 1024 - sql3.cpt4.host-h.net
The scheduled maintenance has been completed.
12:30 AM - 2:52 AM SAST (2h 22min duration)
Planned maintenance: 1011 - Cape Town Data Centre move - 15 January 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Jan 16 1:41 AM SAST (2h 26min duration)
Planned maintenance: 1010 - Cape Town Data Centre move - 15 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Jan 16 12:53 AM SAST (2h 54min duration)
Planned maintenance: 1009 - Cape Town Data Centre move - 15 January 2025 (batch 1)
The scheduled maintenance has been completed.
6:00 PM - 6:17 PM SAST (18min duration)
Planned maintenance: 1018 - Multiple Sql Servers
The scheduled maintenance has been completed.
6:00 PM - 6:22 PM SAST (22min duration)
Planned maintenance: 1019 - sql29.cpt1.host-h.net
The scheduled maintenance has been completed.
9:00 AM - 9:16 AM SAST (16min duration)
Emergency maintenance: 1017 - www37.cpt2.host-h.net hardware swap
The scheduled maintenance has been completed.
7:00 AM - 7:10 AM SAST (10min duration)
Planned maintenance: 1013 - www39.cpt3.host-h.net disk replacement
The scheduled maintenance has been completed.
6:30 AM - 6:51 AM SAST (22min duration)
Planned maintenance: 1008 - Drive replacement: www26.jnb1.host-h.net
The scheduled maintenance has been completed.
6:30 PM - 6:53 PM SAST (24min duration)
Planned maintenance: 1015 - sql3.cpt4.host-h.net
The scheduled maintenance has been completed.
6:00 PM - 6:14 PM SAST (14min duration)
Planned maintenance: 1012 - Multiple Sql Servers
The scheduled maintenance has been completed.
7:59 AM - 8:22 AM SAST (22min duration)
Emergency maintenance: 1007 - www17.cpt3.host-h.net - Unreachable
The scheduled maintenance has been completed.
3:00 AM - 3:45 AM SAST (45min duration)
Planned maintenance: 1003 - Planned maintenance: .COM/.NET Registry Maintenance
The scheduled maintenance has been completed.
2:00 AM - 2:31 AM SAST (32min duration)
Planned maintenance: 1005 - Multiple Sql Server Relocation
The scheduled maintenance has been completed.
12:30 AM - 4:00 AM SAST (3h 30min duration)
Planned maintenance: 1001 - Cape Town Data Centre move - 12 January 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Jan 12 1:10 AM SAST (1h 55min duration)
Planned maintenance: 1000 - Cape Town Data Centre move - 11 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - 11:39 PM SAST (1h 39min duration)
Planned maintenance: 999 - Cape Town Data Centre move - 11 January 2025 (batch 1)
The scheduled maintenance has been completed.
8:43 PM - 8:43 PM SAST (0min duration)
Emergency maintenance: 1004 - German Backup Server Unresponsive
The scheduled maintenance has been completed.
7:45 PM - 8:30 PM SAST (45min duration)
Emergency maintenance: 1006 - Emergency maintenance: switch3-row4.cpt4
The scheduled maintenance has been completed.
12:30 AM - 2:44 AM SAST (2h 14min duration)
Planned maintenance: 998 - Cape Town Data Centre move - 11 January 2025 (batch 3)
The scheduled maintenance has been completed.
11:15 PM - Jan 11 1:37 AM SAST (2h 23min duration)
Planned maintenance: 997 - Cape Town Data Centre move - 10 January 2025 (batch 2)
The scheduled maintenance has been completed.
10:00 PM - Jan 11 12:04 AM SAST (2h 5min duration)
Planned maintenance: 996 - Cape Town Data Centre move - 10 January 2025 (batch 1)
The scheduled maintenance has been completed.
12:30 AM - 5:02 AM SAST (4h 32min duration)
Planned maintenance: 993 - Cape Town Data Centre move - 09 January 2025
The scheduled maintenance has been completed.
11:15 PM - Jan 9 2:55 AM SAST (3h 41min duration)
Planned maintenance: 992 - Cape Town Data Centre move - 08 January 2025
The scheduled maintenance has been completed.
10:00 PM - Feb 17 8:26 AM SAST (39d 10h 26min duration)
Planned maintenance: 994 - Cape Town Data Centre move
The scheduled maintenance has been completed.
10:00 PM - Jan 9 12:48 AM SAST (2h 48min duration)
Planned maintenance: 991 - Cape Town Data Centre move - 08 January 2025
The scheduled maintenance has been completed.
10:00 PM - 10:23 PM SAST (23min duration)
Planned maintenance: 995 - Memory (RAM) & HDD swap, www110.nur4.host-h.net (85.10.213.46)
The scheduled maintenance has been completed.
6:15 AM - 6:36 AM SAST (21min duration)
The scheduled maintenance has been completed.
6:30 AM - 6:47 AM SAST (18min duration)
Planned maintenance: 989 - Hardware Replacement - www107.jnb2.host-h.net
The scheduled maintenance has been completed.
6:15 AM - 9:15 AM SAST (3h duration)
Planned maintenance: 987 - Relocation of CPT2 and CPT3 backup servers
The scheduled maintenance has been completed.
6:15 AM - 3:00 PM SAST (8h 45min duration)
Planned maintenance: 988 - Limited Backup and Restore functionality for CPT2 and CPT3 hosts
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
Planned maintenance: 984 - Hardware upgrade: www540.jnb1.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
Planned maintenance: 985 - sql22.cpt1.host-h.net
The scheduled maintenance has been completed.
7:00 PM - 7:23 PM SAST (23min duration)
Emergency maintenance: 983 - Fan maintenance - www110.nur4.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:19 AM SAST (20min duration)
Planned maintenance: 976 - Multiple Shared Server Upgrades
The scheduled maintenance has been completed.
6:30 AM - 6:41 AM SAST (11min duration)
Emergency maintenance: 982 - Drive maintenance - www26.jnb2.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:11 AM SAST (12min duration)
Planned maintenance: 974 - www14.cpt4.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
Emergency maintenance: 980 - Hardware upgrade - www121.jnb2.host-h.net
The scheduled maintenance has been completed.
10:33 AM - 10:33 AM SAST (0min duration)
979 - Cloudbric websites inaccessible
Websites making use of Cloudbric are inaccessible, our team is investigating the matter.
6:30 AM - 6:43 AM SAST (14min duration)
Planned maintenance: 965 - www5.cpt4.host-h.net
The scheduled maintenance has been completed.
9:00 PM - 9:56 PM SAST (56min duration)
Planned maintenance: 973 - Cape Town Managed Network Routing Move
The scheduled maintenance has been completed.
6:26 PM - 6:26 PM SAST (0min duration)
Intermittent Card Payment Failures
Customers may experience authentication failures when processing card payments due to an intermittent nationwide payment gateway outage. If you are affected, you are welcome to settle your invoice via EFT.
6:00 AM - 6:29 AM SAST (30min duration)
Emergency maintenance: 975 - Disk maintenance - www10.jnb1.host-h.net
The scheduled maintenance has been completed.
6:15 AM - 6:23 AM SAST (9min duration)
Planned maintenance: 964 - www28.cpt4.host-h.net
The scheduled maintenance has been completed.
10:00 AM - 12:00 PM SAST (2h duration)
Planned maintenance: 970 - .DE Registry Maintenance
The scheduled maintenance has been completed.
6:30 AM - 6:46 AM SAST (17min duration)
Planned maintenance: 963 - www2.cpt2.host-h.net
The scheduled maintenance has been completed.
6:00 PM - 6:20 PM SAST (21min duration)
Planned maintenance: 971 - sql33.cpt3.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:30 AM SAST (0min duration)
Planned maintenance: 968 - Drive replacement: sql22.jnb1.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:40 AM SAST (11min duration)
Planned maintenance: 969 - Disk replacement - sql22.jnb1.host-h.net (196.22.142.40)
The scheduled maintenance has been completed.
3:00 AM - 3:45 AM SAST (45min duration)
Planned maintenance: 966 - .COM, .NET Registry Maintenance
Maintenance window: 45 minutes
Attending: Registry Engineers
Symptoms: During the maintenance window availability checks, registrations, renewals and updates for .com/.net domains may not be available.
6:30 AM - 7:00 AM SAST (30min duration)
Emergency maintenance: 967 - Drive replacement: sql22.jnb1.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:57 AM SAST (58min duration)
The scheduled maintenance has been completed.
1:10 PM - 1:40 PM SAST (29min duration)
Emergency maintenance: 961 - www21.flk1.host-h.net - Unreachable
The scheduled maintenance has been completed.
6:00 AM - 7:00 AM SAST (1h duration)
Planned maintenance: 956 - Multiple Shared Server Upgrades
The scheduled maintenance has been completed.
6:00 PM - 6:20 PM SAST (20min duration)
Planned maintenance: 960 - sql37.cpt3.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
Planned maintenance: 955 - www100.cpt1.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 7:04 AM SAST (35min duration)
Emergency maintenance: 959 - Hard Disk replacement - JNB-DC
The scheduled maintenance has been completed.
6:00 AM - 6:44 AM SAST (45min duration)
Planned maintenance: 957 - Multiple Shared Server Upgrades
The scheduled maintenance has been completed.
8:00 PM - 9:00 PM SAST (1h duration)
Emergency maintenance: 958 - www24.cpt3.host-h.net unreachable
The scheduled maintenance has been completed.
5:30 AM - 7:30 AM SAST (2h duration)
Planned maintenance: 953 - Planned maintenance: Switch maintenance for DE servers
The scheduled maintenance has been completed.
9:20 PM - 9:58 PM SAST (39min duration)
Emergency maintenance: 954 - Emergency maintenance: sql17.cpt2.host-h.net
Our Data Centre Technicians have power-cycled the server and it is back online. Affected websites will now be reachable again
11:00 AM - 1:00 PM SAST (2h duration)
Planned maintenance: 952 - .TV Registry Maintenance
The scheduled maintenance has been completed.
6:30 AM - 7:00 AM SAST (30min duration)
Planned maintenance: 949 - www3.cpt2.host-h.net
The scheduled maintenance has been completed.
10:00 PM - 11:44 PM SAST (1h 45min duration)
Planned maintenance: 950 - Planned Maintenance - sql2.cpt2.host-h.net
The scheduled maintenance has been completed.
10:00 PM - 11:45 PM SAST (1h 45min duration)
Planned maintenance: 951 - Planned Maintenance - www521.jnb1.host-h.net
The scheduled maintenance has been completed.
6:30 AM - 6:46 AM SAST (17min duration)
Planned maintenance: 947 - www54.cpt3.host-h.net
The scheduled maintenance has been completed.
6:00 AM - 6:11 AM SAST (12min duration)
Planned maintenance: 948 - www3.cpt2.host-h.net
The scheduled maintenance has been completed.
8:04 AM - 8:04 AM SAST (0min duration)
Intermittent Card Payment Failures
Customers may experience authentication failures when processing card payments due to an intermittent nationwide payment gateway outage. If you are affected, you are welcome to settle your invoice via EFT.
10:28 AM - 10:28 AM SAST (0min duration)
Inbound Xneelo Support Emails (Contact Centre) Down
Inbound emails to the xneelo support email addresses (our Contact Centre) are currently down.
Please make use of telephone lines or our LiveChat platform on our website, or via your xneelo Control Panel if you need to reach us.
087 071 0066 / 0861 0861 08
International: +27 21 970 2000